42nd Interchange/35th Street/Pedestrian Bridges/Median
Work
|
NOTE:
The 42nd St. Bridge and all ramps are now open.
Project Description:
The
42nd Street interchange was reconstructed and a new
bridge built.
35th Street under I-235 will be reconstructed.
Median work from Cummins Parkway to 35th Street
will include storm sewer, barrier construction and paving
of I-235.
The pedestrian bridges near 40th and 44th streets
will be replaced with new arched-style bridges.
Project Schedule:
42nd Street Bridge and interchange - March
- Aug. 2004
35th Street work - Aug. - Dec. 2004
Median work - April -Dec. 2004
Pedestrian bridges - Oct. 2004 - fall 2005
Traffic
Impacts:
35th Street - 35th Street at I-235 will be
closed during construction. The eastbound exit ramp
at 35th Street will remain open during construction.
Median work - Three lanes of traffic in each
direction will be maintained during peak driving times.
|