35th St./31st St./28th St. |
Project
Description:
31st
St.
| |
The 31st St. interchange will be reconstructed and
a new bridge will be built over I-235.
A new eastbound exit ramp will be built at
31st St. to replace the existing exit ramp at 35th
St. |
28th St. & 35th St.
| |
28th
St. and 35th St. bridges will be reconstructed.
The streets will close at I-235 while the bridges are under construction. 28th and 35th streets will not be closed at the same time that 31st St. is closed. |
Project
Schedule: March - Dec. 2005
Traffic
Impacts:
The
bridge and ramps at 31st St., and 35th and 28th streets will be closed at various times during construction.
|
|
|
|
|